Slab

SBPL Drop Head Formwork

Slab

SBPL Drophead Formwork

At Standard Belex, we take pride in revolutionizing formwork systems with our cutting-edge technology. Our SBPL Drop Head System exemplifies our commitment to innovation and sustainability, offering versatile and efficient solutions for a wide range of construction needs. Unlike traditional formwork solutions, our SBPL Drop Head System provides unmatched flexibility and reliability, making it an essential choice for modern construction projects.

Our eco-speedy panels excel in various applications, including columns, walls, plinths, rafts, footings, and foundations, with a unique capability to extend their use to slabs.

  • Designed to seamlessly complement our eco-speedy panels.
  • Includes heavy-duty props, drop heads, aluminum deck beams, and tripods, ensuring stability, reliability, and efficiency.
  • The Drop Head system is the most advanced, high-performance, and economical solution for flat slabs.
  • Unique Drop Head mechanism allows for easy panel removal without re-propping, significantly speeding up the slab cycle time.
  • No need for re-propping allows for the removal of panels from the fifth day, achieving faster slab cycles.
  • Fixed head available for slab heights over 5 meters, compatible with ring lock or cup lock systems, saving costs.
  • SBPL Drop Head System panels weigh only 25 kg/sqm, the lightest among all available systems.
  • Lightweight design makes the system crane-independent, enhancing ease of use and efficiency.
  • Recommended panel heights: 100 cm, 125 cm, 150 cm.
  • Widths range from 300 cm to 750 cm, available at 50 cm intervals.
  • Suitable for slab thicknesses up to 300 mm.

Explore Drop Head Formwork in Action

Skip to content